Ankara Etlik Integrated Health Campus

  • Place
    Ankara / TURKEY
  • Construction Area
    1.071.885 m²
  • Start Date
    March 2016
  • Finish Date
    August 2016

Project: Technical Consultancy Service related to the Work of Design Review Including All MEP and Special Systems for Ankara Etlik Integrated Health Campus Project Through Public Private Partnership (PPP) Model
Employer: Astaldi SpA– Türkerler İnşaat JV
Investor: Ankara Etlik Hospital Healthcare Operation Inc.
Total Bed Capacity: 3.566
Fixed Investment Cost: 1.275.984.900 USD
Investment and Operation Period: 42 months / 25 years
Duration of the Consultancy Agreement: 5 months
The Date of the Consultancy Agreement: 21.03.2016

MANAGEMENT
  • Technical Consulting
  • Project Management
  • Evaluation of Extreme Loading
  • Conditions
  • Risk Management
  • Prep. of Operation and
  • Maintenance Manuals
  • GIS & GPS System Analysis
  • Know-How Transfer
ENGINEERING
  • Environmental Studies
  • Geological and Geotechnical Engineering
  • GIS & GPS Analysis
  • Structural Engineering
  • Earthquake & Extreme Load design
  • Transportation
  • Hydraulic and Water Resources
GROUP
  • Technical Assistance and Advisory Services
  • Tendering and Evaluation
  • Contract Administration
  • Supervision of Construction
  • Inspection of Equipments
  • Quality and Cost Control
  • Institutional and Financial Structuring