Ongoing Projects
Ankara Etlik Integrated Health Campus
-
Place
Ankara / TURKEY
-
Construction Area
1.071.885 m²
-
Start Date
March 2016
-
Finish Date
August 2016
Project: Technical Consultancy Service related to the Work of Design Review Including All MEP and Special Systems for Ankara Etlik Integrated Health Campus Project Through Public Private Partnership (PPP) Model
Employer: Astaldi SpA– Türkerler İnşaat JV
Investor: Ankara Etlik Hospital Healthcare Operation Inc.
Total Bed Capacity: 3.566
Fixed Investment Cost: 1.275.984.900 USD
Investment and Operation Period: 42 months / 25 years
Duration of the Consultancy Agreement: 5 months
The Date of the Consultancy Agreement: 21.03.2016
MANAGEMENT
- Technical Consulting
- Project Management
- Evaluation of Extreme Loading
- Conditions
- Risk Management
- Prep. of Operation and
- Maintenance Manuals
- GIS & GPS System Analysis
- Know-How Transfer
ENGINEERING
- Environmental Studies
- Geological and Geotechnical Engineering
- GIS & GPS Analysis
- Structural Engineering
- Earthquake & Extreme Load design
- Transportation
- Hydraulic and Water Resources
GROUP
- Technical Assistance and Advisory Services
- Tendering and Evaluation
- Contract Administration
- Supervision of Construction
- Inspection of Equipments
- Quality and Cost Control
- Institutional and Financial Structuring