Ünye Raw Material Silo

  • Place
    Ünye / TURKEY
  • Construction Area
  • Start Date
    December 1999
  • Finish Date
    March 2000

Project: Design and Engineering Services for Ünye Raw Material Silo
Employer: ÜÇS Cement Industry in Ünye
Contractor: Oyak Construction
Silo Capacity: 22.000 ton
Diameter: 22 m
Height: 90 m
Duration of the Consultants Agreement: 15 months
The Date of the Consultants Agreement: 10.12.1999

MANAGEMENT
  • Technical Consulting
  • Project Management
  • Risk Management
  • Evaluation of Extreme Loading Conditions
  • Prep. of Operation and Maintenance Manuals
  • Material and Equipment Testing
  • GIS & GPS System Analysis
  • Know-How Transfer
ENGINEERING
  • Building Construction
  • -Parking’s & High-rise Buildings
  • -Industrial Buildings
  • Bridges
  • Tunnels
  • Water & Digester Tanks & Silos
  • Towers
GROUP
  • Technical Assistance and Advisory Services
  • Tendering and Evaluation
  • Contract Administration
  • Supervision of Construction
  • Inspection of Equipments
  • Quality and Cost Control
  • Institutional and Financial Structuring