Completed Projects
Turkish Republic General Consulate of Switzerland
-
Place
Zurich / Switzerland
-
Construction Area
720 m²
-
Start Date
February 1999
-
Finish Date
November 1999
Project : Reconstruction and Rehabilitation of a Multistory Building to Utilize as Turkish General Consulate in Zurich
Employer: Ministry Of Foreign Affairs Consulate General In Zurich
Contractor: HRS Hauser Rütihauser Suter AG / Kreuzlingen
Duration of the Consultant Agreement: 9 months
The Date of the Consultant Agreemen: 01.02.1999
MANAGEMENT
- Technical Consulting
- Project Management
- Risk Management
- Evaluation of Extreme Loading Conditions
- Prep. of Operation and Maintenance Manuals
- Material and Equipment Testing
- GIS & GPS System Analysis
- Know-How Transfer
ENGINEERING
- Environmental Studies
- Geological and Geotechnical Engineering
- GIS & GPS Analysis
- Structural Engineering
- Earthquake & Extreme Load design
- Transportation
- Hydraulic and Water Resources
GROUP
- Technical Assistance and Advisory Services
- Tendering and Evaluation
- Contract Administration
- Supervision of Construction
- Inspection of Equipments
- Quality and Cost Control
- Institutional and Financial Structuring