Completed Projects

Turkish Patent Institute Campus

  • Place
    Ankara / TURKEY
  • Construction Area
    32.000 m²
  • Start Date
    November 2001
  • Finish Date
    November 2003

Project: Turkish Patent Institute Campus Building Construction Management and Supervision Services
Employer: Turkish Patent Institute
Contractor: Haşemoğlu Construction – Aydeniz Construction JV
Duration of the Consultant Agreement: 24 months
The Date of the Consultant Agreement: 23.11.2001

MANAGEMENT
  • Technical Consulting
  • Project Management
  • Risk Management
  • Evaluation of Extreme Loading Conditions
  • Prep. of Operation and Maintenance Manuals
  • Material and Equipment Testing
  • GIS & GPS System Analysis
  • Know-How Transfer
ENGINEERING
  • Environmental Studies
  • Geological and Geotechnical Engineering
  • GIS & GPS Analysis
  • Structural Engineering
  • Earthquake & Extreme Load design
  • Transportation
  • Hydraulic and Water Resources
GROUP
  • Technical Assistance and Advisory Services
  • Tendering and Evaluation
  • Contract Administration
  • Supervision of Construction
  • Inspection of Equipments
  • Quality and Cost Control
  • Institutional and Financial Structuring