Completed Projects
Turkish Patent Institute Campus
-
Place
Ankara / TURKEY
-
Construction Area
32.000 m²
-
Start Date
November 2001
-
Finish Date
November 2003
Project: Turkish Patent Institute Campus Building Construction Management and Supervision Services
Employer: Turkish Patent Institute
Contractor: Haşemoğlu Construction – Aydeniz Construction JV
Duration of the Consultant Agreement: 24 months
The Date of the Consultant Agreement: 23.11.2001
MANAGEMENT
- Technical Consulting
- Project Management
- Risk Management
- Evaluation of Extreme Loading Conditions
- Prep. of Operation and Maintenance Manuals
- Material and Equipment Testing
- GIS & GPS System Analysis
- Know-How Transfer
ENGINEERING
- Environmental Studies
- Geological and Geotechnical Engineering
- GIS & GPS Analysis
- Structural Engineering
- Earthquake & Extreme Load design
- Transportation
- Hydraulic and Water Resources
GROUP
- Technical Assistance and Advisory Services
- Tendering and Evaluation
- Contract Administration
- Supervision of Construction
- Inspection of Equipments
- Quality and Cost Control
- Institutional and Financial Structuring