Completed Projects

TEFER Project

  • Place
    North West Anatolia/ Turkey
  • Construction Area
    100 km²
  • Start Date
    April 2002
  • Finish Date
    October 2003

Project: Construction Monitoring Services for Turkey Emergency Flood and Earthquake Recovery Project
Employer: Republic of Turkey Ministry of Energy and Natural Resources
Total Demolition Of Existing Building: 65.500 m³
Total Industrial Manufacturing Excavation: 282.770 m³
Total Piling: 30.975 m (80 cm diameter)
Total Concrete Manufacturing: 90.370 m³
Total Coating Road: 1.560 m
Duration of the Consultants Agreement: 18 months
Date of the Consultants Agreement: 17.04.2002

MANAGEMENT
  • Technical Consulting
  • Project Management
  • Risk Management
  • Evaluation of Extreme Loading Conditions
  • Prep. of Operation and Maintenance Manuals
  • Material and Equipment Testing
  • GIS & GPS System Analysis
  • Know-How Transfer
ENGINEERING
  • Environmental Studies
  • Geological and Geotechnical Engineering
  • GIS & GPS Analysis
  • Structural Engineering
  • Earthquake & Extreme Load design
  • Transportation
  • Hydraulic and Water Resources
GROUP
  • Technical Assistance and Advisory Services
  • Tendering and Evaluation
  • Contract Administration
  • Supervision of Construction
  • Inspection of Equipments
  • Quality and Cost Control
  • Institutional and Financial Structuring