Completed Projects

Sheraton Hotel, Culture and Congress Centre

  • Place
    Ankara / TURKEY
  • Construction Area
    1.755 m²
  • Start Date
    January 2001
  • Finish Date
    September 2003

Project: Controlling, Supervision and Monitoring of Prestressed Slabs and Static Calculations and Design of Prestressed Parts of the Structure for Sheraton Hotel, Culture and Congress Centre
Employer: Turser Tourism and Trade Ltd. Co.
Contractor: Nurol Engineering and Construction Inc.
Duration of the Consultant Agreement: 32 months
The Date of the Consultant Agreement: 11.01.2001

MANAGEMENT
  • Technical Consulting
  • Project Management
  • Risk Management
  • Evaluation of Extreme Loading Conditions
  • Prep. of Operation and Maintenance Manuals
  • Material and Equipment Testing
  • GIS & GPS System Analysis
  • Know-How Transfer
ENGINEERING
  • Building Construction
  • -Parking’s & High-rise Buildings
  • -Industrial Buildings
  • Bridges
  • Tunnels
  • Water & Digester Tanks & Silos
  • Towers
GROUP
  • Technical Assistance and Advisory Services
  • Tendering and Evaluation
  • Contract Administration
  • Supervision of Construction
  • Inspection of Equipments
  • Quality and Cost Control
  • Institutional and Financial Structuring