Rehabilitation and Construction of 44 High School Project

  • Place
    Ankara / TURKEY
  • Construction Area
  • Start Date
    October 2002
  • Finish Date
    March 2004

Project: Consultants Services and Contract Management for 44 High School Construction Projects and 28 High School Rehabilitation Projects in Ankara
Employer: Republic of Turkey, Ministry of National Education, Department of Investment and Facilities
Duration of the Consultant Agreement: 20 months
The Date of the Consultant Agreement: 03.10.2002

MANAGEMENT
  • Technical Consulting
  • Project Management
  • Risk Management
  • Evaluation of Extreme Loading Conditions
  • Prep. of Operation and Maintenance Manuals
  • Material and Equipment Testing
  • GIS & GPS System Analysis
  • Know-How Transfer
ENGINEERING
  • Environmental Studies
  • Geological and Geotechnical Engineering
  • GIS & GPS Analysis
  • Structural Engineering
  • Earthquake & Extreme Load design
  • Transportation
  • Hydraulic and Water Resources
GROUP
  • Technical Assistance and Advisory Services
  • Tendering and Evaluation
  • Contract Administration
  • Supervision of Construction
  • Inspection of Equipments
  • Quality and Cost Control
  • Institutional and Financial Structuring