Rehabilitation and Construction of 44 High School Project
-
Place
Ankara / TURKEY
-
Construction Area
-
Start Date
October 2002
-
Finish Date
March 2004
Project: Consultants Services and Contract Management for 44 High School Construction Projects and 28 High School Rehabilitation Projects in Ankara
Employer: Republic of Turkey, Ministry of National Education, Department of Investment and Facilities
Duration of the Consultant Agreement: 20 months
The Date of the Consultant Agreement: 03.10.2002
MANAGEMENT
- Technical Consulting
- Project Management
- Risk Management
- Evaluation of Extreme Loading Conditions
- Prep. of Operation and Maintenance Manuals
- Material and Equipment Testing
- GIS & GPS System Analysis
- Know-How Transfer
ENGINEERING
- Environmental Studies
- Geological and Geotechnical Engineering
- GIS & GPS Analysis
- Structural Engineering
- Earthquake & Extreme Load design
- Transportation
- Hydraulic and Water Resources
GROUP
- Technical Assistance and Advisory Services
- Tendering and Evaluation
- Contract Administration
- Supervision of Construction
- Inspection of Equipments
- Quality and Cost Control
- Institutional and Financial Structuring