Completed Projects

Protocol Road Viaduct

  • Place
    Ankara / TURKEY
  • Construction Area
  • Start Date
    November 2006
  • Finish Date
    November 2007

Project: Design and Construction Monitoring Works for Protocol Road Viaduct
Employer: TOBAŞ (The Housing Development Administration of Turkey + Ankara Metropolitan Municipality)
Length: 230 m
Arch Span: 160 m
Height: 40 m
Duration of the Consultant Agreement: 12 months
The Date of the Consultant Agreement: 10.11.2006

MANAGEMENT
  • Technical Consulting
  • Project Management
  • Risk Management
  • Evaluation of Extreme Loading Conditions
  • Prep. of Operation and Maintenance Manuals
  • Material and Equipment Testing
  • GIS & GPS System Analysis
  • Know-How Transfer
ENGINEERING
  • Building Construction
  • -Parking’s & High-rise Buildings
  • -Industrial Buildings
  • Bridges
  • Tunnels
  • Water & Digester Tanks & Silos
  • Towers
GROUP
  • Technical Assistance and Advisory Services
  • Tendering and Evaluation
  • Contract Administration
  • Supervision of Construction
  • Inspection of Equipments
  • Quality and Cost Control
  • Institutional and Financial Structuring