Completed Projects

Kepezkaya to Dam and Hydro Power Plant

  • Place
    Karaman / TURKEY
  • Construction Area
  • Start Date
    April 2008
  • Finish Date
    May 2012

Project: Project Management and Supervision Services for Kepezkaya Dam And Hydro Power Plant
Employer: AES-IC İÇTAŞ Energy Generation and Trade Inc.
Contractor: IC İÇTAŞ Construction and Trade Co. Inc.
Total Installed Capacity: 28,17 MW
Duration of the Consultants Agreement: 49 months
Date of the Consultants Agreement: 10.04.2008

MANAGEMENT
  • Technical Consulting
  • Project Management
  • Risk Management
  • Evaluation of Extreme Loading Conditions
  • Prep. of Operation and Maintenance Manuals
  • Material and Equipment Testing
  • GIS & GPS System Analysis
  • Know-How Transfer
ENGINEERING
  • Environmental Studies
  • Geological and Geotechnical Engineering
  • GIS & GPS Analysis
  • Structural Engineering
  • Earthquake & Extreme Load design
  • Transportation
  • Hydraulic and Water Resources
GROUP
  • Technical Assistance and Advisory Services
  • Tendering and Evaluation
  • Contract Administration
  • Supervision of Construction
  • Inspection of Equipments
  • Quality and Cost Control
  • Institutional and Financial Structuring