Kepezkaya to Dam and Hydro Power Plant
-
Place
Karaman / TURKEY
-
Construction Area
-
Start Date
April 2008
-
Finish Date
May 2012
Project: Project Management and Supervision Services for Kepezkaya Dam And Hydro Power Plant
Employer: AES-IC İÇTAŞ Energy Generation and Trade Inc.
Contractor: IC İÇTAŞ Construction and Trade Co. Inc.
Total Installed Capacity: 28,17 MW
Duration of the Consultants Agreement: 49 months
Date of the Consultants Agreement: 10.04.2008
MANAGEMENT
- Technical Consulting
- Project Management
- Risk Management
- Evaluation of Extreme Loading Conditions
- Prep. of Operation and Maintenance Manuals
- Material and Equipment Testing
- GIS & GPS System Analysis
- Know-How Transfer
ENGINEERING
- Environmental Studies
- Geological and Geotechnical Engineering
- GIS & GPS Analysis
- Structural Engineering
- Earthquake & Extreme Load design
- Transportation
- Hydraulic and Water Resources
GROUP
- Technical Assistance and Advisory Services
- Tendering and Evaluation
- Contract Administration
- Supervision of Construction
- Inspection of Equipments
- Quality and Cost Control
- Institutional and Financial Structuring