Completed Projects
ETI Grade-Separated Intersection Bridge and Approach Roads
-
Place
Ankara / TURKEY
-
Construction Area
-
Start Date
November 1999
-
Finish Date
December 2001
Project : Static and Dynamic Calculations and Design of Eti Prestressed Concrete Bridge
Employer: Ankara Metropolitan Municipality
Length: 44 m
Deck Thickness: 140 cm
Specialty: Turkey's First Art Lift Bridge
Duration of the Consultant Agreement: 25 months
The Date of the Consultant Agreemen: 10.11.1999
MANAGEMENT
- Technical Consulting
- Project Management
- Risk Management
- Evaluation of Extreme Loading Conditions
- Prep. of Operation and Maintenance Manuals
- Material and Equipment Testing
- GIS & GPS System Analysis
- Know-How Transfer
ENGINEERING
- Building Construction
- -Parking’s & High-rise Buildings
- -Industrial Buildings
- Bridges
- Tunnels
- Water & Digester Tanks & Silos
- Towers
GROUP
- Technical Assistance and Advisory Services
- Tendering and Evaluation
- Contract Administration
- Supervision of Construction
- Inspection of Equipments
- Quality and Cost Control
- Institutional and Financial Structuring