ETI Grade-Separated Intersection Bridge and Approach Roads

  • Place
    Ankara / TURKEY
  • Construction Area
  • Start Date
    November 1999
  • Finish Date
    December 2001

Project : Static and Dynamic Calculations and Design of Eti Prestressed Concrete Bridge
Employer: Ankara Metropolitan Municipality
Length: 44 m
Deck Thickness: 140 cm
Specialty: Turkey's First Art Lift Bridge
Duration of the Consultant Agreement: 25 months
The Date of the Consultant Agreemen: 10.11.1999

MANAGEMENT
  • Technical Consulting
  • Project Management
  • Risk Management
  • Evaluation of Extreme Loading Conditions
  • Prep. of Operation and Maintenance Manuals
  • Material and Equipment Testing
  • GIS & GPS System Analysis
  • Know-How Transfer
ENGINEERING
  • Building Construction
  • -Parking’s & High-rise Buildings
  • -Industrial Buildings
  • Bridges
  • Tunnels
  • Water & Digester Tanks & Silos
  • Towers
GROUP
  • Technical Assistance and Advisory Services
  • Tendering and Evaluation
  • Contract Administration
  • Supervision of Construction
  • Inspection of Equipments
  • Quality and Cost Control
  • Institutional and Financial Structuring