Completed Projects
Ermenek Dam and Hydroelectric Power Plant
-
Place
Konya / TURKEY
-
Construction Area
-
Start Date
May 2002
-
Finish Date
September 2003
Project: Construction Monitoring Services for Ermenek Dam and Hydro Power Plant
Employer: DSI General Directorate of State Hydraulic Works
Contractor: BM Construction Co. Inc.
The Amount of Concrete in the Dam Body : 272.334 m³
Dam of Height: 210 m
Duration of the Consultants Agreement: 16 months
Date of the Consultants Agreement: 21.05.2002
MANAGEMENT
- Technical Consulting
- Project Management
- Risk Management
- Evaluation of Extreme Loading Conditions
- Prep. of Operation and Maintenance Manuals
- Material and Equipment Testing
- GIS & GPS System Analysis
- Know-How Transfer
ENGINEERING
- Environmental Studies
- Geological and Geotechnical Engineering
- GIS & GPS Analysis
- Structural Engineering
- Earthquake & Extreme Load design
- Transportation
- Hydraulic and Water Resources
GROUP
- Technical Assistance and Advisory Services
- Tendering and Evaluation
- Contract Administration
- Supervision of Construction
- Inspection of Equipments
- Quality and Cost Control
- Institutional and Financial Structuring