Ermenek Dam and Hydroelectric Power Plant

  • Place
    Konya / TURKEY
  • Construction Area
  • Start Date
    May 2002
  • Finish Date
    September 2003

Project: Construction Monitoring Services for Ermenek Dam and Hydro Power Plant
Employer: DSI General Directorate of State Hydraulic Works
Contractor: BM Construction Co. Inc.
The Amount of Concrete in the Dam Body : 272.334 m³
Dam of Height: 210 m
Duration of the Consultants Agreement: 16 months
Date of the Consultants Agreement: 21.05.2002

MANAGEMENT
  • Technical Consulting
  • Project Management
  • Risk Management
  • Evaluation of Extreme Loading Conditions
  • Prep. of Operation and Maintenance Manuals
  • Material and Equipment Testing
  • GIS & GPS System Analysis
  • Know-How Transfer
ENGINEERING
  • Environmental Studies
  • Geological and Geotechnical Engineering
  • GIS & GPS Analysis
  • Structural Engineering
  • Earthquake & Extreme Load design
  • Transportation
  • Hydraulic and Water Resources
GROUP
  • Technical Assistance and Advisory Services
  • Tendering and Evaluation
  • Contract Administration
  • Supervision of Construction
  • Inspection of Equipments
  • Quality and Cost Control
  • Institutional and Financial Structuring