Completed Projects
Ericsson Tower Tube
Project: Static and Dynamic Calculations and Design of Prestressed – Fiber Concrete Body of Thin Walled, 40 m High Tube for Ericsson Tower Tube
Employer: Ericsson Telecommunication Systems Sweden
Contract: Ericsson Telecommunication Systems Sweden
Tower Height: 40 m
Tower Diameter: 2 m
Tower Thickness: 7,5 cm Fiber Concrete
Duration Of The Consultant Agreement: 18 Months
The Date Of The Consultant Agreement: 28.02.2006
MANAGEMENT
- Technical Consulting
- Project Management
- Risk Management
- Evaluation of Extreme Loading Conditions
- Prep. of Operation and Maintenance Manuals
- Material and Equipment Testing
- GIS & GPS System Analysis
- Know-How Transfer
ENGINEERING
- Building Construction
- -Parking’s & High-rise Buildings
- -Industrial Buildings
- Bridges
- Tunnels
- Water & Digester Tanks & Silos
- Towers
GROUP
- Technical Assistance and Advisory Services
- Tendering and Evaluation
- Contract Administration
- Supervision of Construction
- Inspection of Equipments
- Quality and Cost Control
- Institutional and Financial Structuring