Completed Projects

Ericsson Tower Tube

  • Place
    Stockholm, Respectively All Over The World
  • Construction Area
  • Start Date
    February 2006
  • Finish Date
    August 2007

Project: Static and Dynamic Calculations and Design of Prestressed – Fiber Concrete Body of Thin Walled, 40 m High Tube for Ericsson Tower Tube
Employer: Ericsson Telecommunication Systems Sweden
Contract: Ericsson Telecommunication Systems Sweden
Tower Height: 40 m
Tower Diameter: 2 m
Tower Thickness: 7,5 cm Fiber Concrete
Duration Of The Consultant Agreement: 18 Months
The Date Of The Consultant Agreement: 28.02.2006

MANAGEMENT
  • Technical Consulting
  • Project Management
  • Risk Management
  • Evaluation of Extreme Loading Conditions
  • Prep. of Operation and Maintenance Manuals
  • Material and Equipment Testing
  • GIS & GPS System Analysis
  • Know-How Transfer
ENGINEERING
  • Building Construction
  • -Parking’s & High-rise Buildings
  • -Industrial Buildings
  • Bridges
  • Tunnels
  • Water & Digester Tanks & Silos
  • Towers
GROUP
  • Technical Assistance and Advisory Services
  • Tendering and Evaluation
  • Contract Administration
  • Supervision of Construction
  • Inspection of Equipments
  • Quality and Cost Control
  • Institutional and Financial Structuring