Completed Projects

Deriner Dam and Hydro Power Plant

  • Place
    Artvin / TURKEY
  • Construction Area
  • Start Date
    January 2000
  • Finish Date
    January 2004

Project: Construction Monitoring Services for Deriner Dam and Hydro Power Plant
Employer: Turkish Republic Ministry of Energy and Natural Resources, State Water Affairs, General Directorate of Dams of Department
The Amount of Concretein the Dam Body: 3.500.000 m³
Dam of Height: 253 m
Duration of the Consultants Agreement: 46 months
Date of the Consultants Agreement: 30.01.2000

MANAGEMENT
  • Technical Consulting
  • Project Management
  • Risk Management
  • Evaluation of Extreme Loading Conditions
  • Prep. of Operation and Maintenance Manuals
  • Material and Equipment Testing
  • GIS & GPS System Analysis
  • Know-How Transfer
ENGINEERING
  • Environmental Studies
  • Geological and Geotechnical Engineering
  • GIS & GPS Analysis
  • Structural Engineering
  • Earthquake & Extreme Load design
  • Transportation
  • Hydraulic and Water Resources
GROUP
  • Technical Assistance and Advisory Services
  • Tendering and Evaluation
  • Contract Administration
  • Supervision of Construction
  • Inspection of Equipments
  • Quality and Cost Control
  • Institutional and Financial Structuring