Deriner Dam and Hydro Power Plant
-
Place
Artvin / TURKEY
-
Construction Area
-
Start Date
January 2000
-
Finish Date
January 2004
Project: Construction Monitoring Services for Deriner Dam and Hydro Power Plant
Employer: Turkish Republic Ministry of Energy and Natural Resources, State Water Affairs, General Directorate of Dams of Department
The Amount of Concretein the Dam Body: 3.500.000 m³
Dam of Height: 253 m
Duration of the Consultants Agreement: 46 months
Date of the Consultants Agreement: 30.01.2000
MANAGEMENT
- Technical Consulting
- Project Management
- Risk Management
- Evaluation of Extreme Loading Conditions
- Prep. of Operation and Maintenance Manuals
- Material and Equipment Testing
- GIS & GPS System Analysis
- Know-How Transfer
ENGINEERING
- Environmental Studies
- Geological and Geotechnical Engineering
- GIS & GPS Analysis
- Structural Engineering
- Earthquake & Extreme Load design
- Transportation
- Hydraulic and Water Resources
GROUP
- Technical Assistance and Advisory Services
- Tendering and Evaluation
- Contract Administration
- Supervision of Construction
- Inspection of Equipments
- Quality and Cost Control
- Institutional and Financial Structuring