Completed Projects
Ankara Central Wastewater Treatment Plant
-
Place
Ankara / TURKEY
-
Construction Area
1.820.000 m²
-
Start Date
June 1992
-
Finish Date
June 1996
Project: Design, Engineering Service and Construction Supervision for Ankara Central Wastewater Treatment Plant
Employer: Ankara Metropolitan Municipality General Directorate of ASKI
Daily Waste Processing Capacity: 765.000 m³/day
Total Excavation Amount: 3.000.000 m³
Total Concrete Quantity: 250.000 m
The Total Amount Of Reinforcement: 20.000 ton
Total Installed Power: 10 MW
Duration of the Consultant Agreement: 56 months
The Date of the Consultant Agreement: 05.06.1992
MANAGEMENT
- Technical Consulting
- Project Management
- Risk Management
- Evaluation of Extreme Loading Conditions
- Prep. of Operation and Maintenance Manuals
- Material and Equipment Testing
- GIS & GPS System Analysis
- Know-How Transfer
ENGINEERING
- Building Construction
- -Parking’s & High-rise Buildings
- -Industrial Buildings
- Bridges
- Tunnels
- Water & Digester Tanks & Silos
- Towers
GROUP
- Technical Assistance and Advisory Services
- Tendering and Evaluation
- Contract Administration
- Supervision of Construction
- Inspection of Equipments
- Quality and Cost Control
- Institutional and Financial Structuring