Completed Projects

Ankara Central Wastewater Treatment Plant

  • Place
    Ankara / TURKEY
  • Construction Area
    1.820.000 m²
  • Start Date
    June 1992
  • Finish Date
    June 1996

Project: Design, Engineering Service and Construction Supervision for Ankara Central Wastewater Treatment Plant
Employer: Ankara Metropolitan Municipality General Directorate of ASKI
Daily Waste Processing Capacity: 765.000 m³/day
Total Excavation Amount: 3.000.000 m³
Total Concrete Quantity: 250.000 m
The Total Amount Of Reinforcement: 20.000 ton
Total Installed Power: 10 MW
Duration of the Consultant Agreement: 56 months
The Date of the Consultant Agreement: 05.06.1992

MANAGEMENT
  • Technical Consulting
  • Project Management
  • Risk Management
  • Evaluation of Extreme Loading Conditions
  • Prep. of Operation and Maintenance Manuals
  • Material and Equipment Testing
  • GIS & GPS System Analysis
  • Know-How Transfer
ENGINEERING
  • Building Construction
  • -Parking’s & High-rise Buildings
  • -Industrial Buildings
  • Bridges
  • Tunnels
  • Water & Digester Tanks & Silos
  • Towers
GROUP
  • Technical Assistance and Advisory Services
  • Tendering and Evaluation
  • Contract Administration
  • Supervision of Construction
  • Inspection of Equipments
  • Quality and Cost Control
  • Institutional and Financial Structuring